EasyManua.ls Logo

Sartorius BioPAT Trace - Page 52

Sartorius BioPAT Trace
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52 BioPAT
®
Trace | Multi Trace Operating Instructions
Initial Installation
t Afterwards, the rest of the components must
be attached to the device. Using the holding
slit on the side, fasten the diffusion module to
the mounting rail.
t Make sure that the diffusion module is
properly aligned with the arrow pointing
upwards.
The conductivity cell is fastened to the device by
tightening the knurled nut.
t Next, insert the two drip counters into the
holders designed for this purpose.
Fig. 18: Waste line connection

Table of Contents

Related product manuals