EasyManua.ls Logo

Sartorius BioPAT Trace - Page 72

Sartorius BioPAT Trace
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
72 BioPAT
®
Trace | Multi Trace Operating Instructions
Initial Installation
Work step Function Chapter Page Status
9 Starting the measurements 8.1.1 78
Confirm “Fill” button and wait for
calibration
8 75ff
Alternatively: Activate the “Start
autom.” option – device starts
measurement automatically after
filling and calibration
75ff
10 For methanol | ethanol only:
Connect enzyme reactor
6.1.5 54
Einbau des Enzymreaktor in das
Schlauchset
54ff
11 Check measuring chamber 4.3 and
6.1.2
33 | 41
Check measuring chamber for
absence of air bubbles | rinse if
necessary
33 | 41
12 For dialysis only: Perform
reference measurement
8.2.1 82ff
Perform reference measurement
with external sample or known
measurement value
82ff
13
Optional: Connect analog output
to process control system
8.3.7 89
Connect analog output (0–10 V,
4–20 mA or 0–20 mA)
89

Table of Contents

Related product manuals