Check List
Before start up check the following:
1. Check if insulating distance according to technical data ( Chapter #3).
2. Assure that the screw connection of the high voltage connection is properly
fastened and well-greased ( Chapter #11.3.2 and Chapter #11.3.3).
3. Check tightness of compressed air connections ( Chapter #11.4.7).
4. Check if static contact force according to technical data ( Chapter #3).
5. Assure that the sliding strips are seated friction free ( Chapter #11.4.3.2).
6. Check turning capacity of pan head ( Chapter #14.12).
7. Check if raising and lowering times are according to technical data
( Chapter #3).