EasyManua.ls Logo

SCHUNK WBL 22.03 - Shunts

SCHUNK WBL 22.03
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Schunk Bahn- und Industrietechnik GmbH
Maintenance
SB-038483-EN.docx
66 / 147
Datum: 13.02.2018
SAP.Nr.10901359
Index: -
Shunts
Shunts must be checked for damage.
Shunts must be replaced within the scheduled maintenance
intervals Chapter #11.2
Damaged shunts must be replaced.
Current connections and tubular lugs of shunts must be
free from coating, blank and clean.
Procedure:
1. Check shunts for break of wires and braids:
Shunts must be replaced if more than 5% of the wires are broken.
2. Check contact surfaces (current connections and tubular lugs of shunts) for
dirt, corrosion and / or burn-up.
a. Detach shunts with dirty, corroded and / or burnt contact surfaces.
b. Clean dirty contact surfaces.
c. Grease current connections and tubular lugs of shunts
( Chapter #11.3.3).
d. Attach new shunts ( Chapter #11.5.5).

Table of Contents