EasyManua.ls Logo

SCHUNK WBL 22.03 - Maintenance Intervals; Interval 1 - Every Week (Max. 7000 Km); Interval 2 - Every Month (Max. 21.000 Km)

SCHUNK WBL 22.03
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Schunk Bahn- und Industrietechnik GmbH
Maintenance
SB-038483-EN.docx
49 / 147
Datum: 13.02.2018
SAP.Nr.10901359
Index: -
Maintenance Intervals
The single arm pantograph requires a minimum of maintenance.
The required maintenance is influenced by the environmental and operational
conditions, so the operator has accordingly to adapt.
Interval 1 Every Week (max. 7000 km)
Checkup
o Sliding strips and horns for damage and wear ( Chapter #11.4.3.1.)
Replace sliding strips if necessary ( Chapter #11.5.3.1).
o Check static contact force after replacement of components ( Chapter #14.8).
Interval 2 Every Month (max. 21.000 km)
Checkup
o Pantograph for obviously damaged components.
o Check static contact force after replacement of components ( Chapter #14.8).

Table of Contents

Related product manuals