EasyManua.ls Logo

SCHUNK WBL 22.03 - General Information

SCHUNK WBL 22.03
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Schunk Bahn- und Industrietechnik GmbH
Adjustment Procedures
SB-038483-EN.docx
88 / 147
Datum: 13.02.2018
SAP.Nr.10901359
Index: -
General Information
Detach shock absorber while performing adjustment
procedures ( Chapter #11.5.4).
Otherwise results will be falsified.
Each pantograph has been properly adjusted by the manufacturer. After repair,
replacement of components or disassembly the following adjustment procedures
have to be executed:
1. Checkup of resting position.
2. Adjustment of resting position.
3. Adjustment of support springs.
4. Adjustment of air bellow drive.
5. Adjustment of Blow – Off valve.
6. Checkup of static contact force.
7. Adjustment of static contact force.
8. Adjustment of trend of static contact force.
9. Adjustment of raising and lowering time.
10. Adjustment of turning capacity of pan head.
11. After all adjustment procedures have been done, the shock absorber must be
attached again ( Chapter #11.5.4).

Table of Contents