4. INSTALLATION
13.
DIRECT
CONNECTION TO A
CENTRALIZED
DRAINING POINT
Follow the instructions shown below for a correct direct connection to a centralized draining
point:
– Insert the silicone tube (provided) or other suitable plastic tube onto hose connection A;
push the tube all the way on and lock with the plastic tie or other means;
– Cut the tube to measure, push the free end on the connection provided on the centralized
draining point and lock with the plastic tie or other means;
MAKE SURE THE TUBE IS NOT BENT, KINKED OR OBSTRUCTED IN ANY WAY.
The following diagram depicts the ideal arrangement of components:
A
Clip
Was her
Clip
P ipe
To the centralized
draining point
Centralized
draining point
Support plane
This point must be at level lower
than the sterilizer ’s support plane
THE CONNECTION POINT TO THE CENTRAL DRAIN MUST BE LOWER THAN THE
STERILIZER'S SUPPORT SURFACE, OTHERWISE THE TANK MAY NOT EMPTY CORRECTLY.