6 Electrical installation
6.1 Connecting
Overview
T
he device is connected via the M12 plug connector.
Prerequisites
•
Mount
ing is completed.
•
Electrical installation is carried out according to the project planning.
•
Electrical installation is carried out according to the requirements for integration
into the electrical control system,
•
Dangerous condition of the machine is and remains off during the electrical instal‐
lation.
•
Outputs of the device have no effect on the machine during electrical installation.
Further topics
•
"Pr
oject planning", Seite 22
•
"Integrating the equipment into the electrical control", page 39
•
"Mounting", Seite 51
•
"Device overview", page 12
6.1.1 System connection
Prerequisites
•
Use shie
lded cables.
System connection M12, 8-pin
Figure 28: Male connector M12, 8-pin, A-coded
T
able 21: Pin assignment M12, 8-pin
PIN Designation Description
1 +24 VDC Supply voltage (24VDC)
2 OSSD1.A OSSD pair 1, OSSD A
3 0VDC Supply voltage (0VDC)
4 OSSD1.B OSSD pair 1, OSSD B
5 Uni I/O 1
•
U
niversal I/O 1, configurable
•
Static control input (B) together with pin 8
•
Parity evaluation 3pins (P3.2) together with pin 7
and 8
•
Parity evaluation 4pins (P4.2) together with pin 6, 7
and 8
6 OSSD2.A
U
ni-I/O 2
•
O
SSD pair 2, OSSD A
•
Universal I/O 2, configurable
•
Static control input (A1) together with pin 7
•
Parity evaluation 4pins (P4.1) together with pin 5, 7
and 8
ELECTRICAL INSTALLATION 6
8025919/1I9E/2023-01-09 | SICK O P E R A T I N G I N S T R U C T I O N S | safeVisionary2
53
Subject to change without notice