21
8017171/115Z/V3-0/2019-01/ SICK OPERATING INSTRUCTIONS | VISIC100SF
Subject to change without notice
INSTALLATION
Table 3: Tools
3.3 Preparing the installation location
▸ Secure the place of work
▸ Provide sufficient light, power and, when necessary, a lifting platform at the place of
work.
Keep fixing material available as well as suitable drills, lines, socket wrench set, marking
material, measurement tools.
Line, 2 m (3 x 2 0.75 mm
2
) 2076481
Lines for RS-485 interface.
Line, 5 m (3 x 0.75 mm
2
) 2076482
Line, 10 m (3 x 0.75 mm
2
) 2076483
Line, 20 m (3 x 0.75 mm
2
) 2076484
Ferrules
Length:
Min. 10 mm; max. 20 mm
For onsite lines.
To prepare flexible leads.
Note: Delivered in enclosure.
Material required Part number Required for
Tools required Characteristics Required for
Hammer drill Masonry drill, ø 8 mm Drill holes
Hammer Hammer in the steel tie bar.
Allen key SW4
To open the cover of the measuring unit and for
the gas sensors.
Wrench
SW24
SW27
SW13
SW10
Screw plugs of gas sensors
Cable gland.
Fastening nut of steel tie bar
Grounding bolt.
Flat-blade screwdriver Max. 3 mm Line installation.
Ferrule pliers For onsite lines.
Observe the country-specific tunnel regulations for assembly material.
Suitable ferrules are made available as standard. These are not required for lines from
SICK.
▸ Determine the angle of inclination: see “Maximum allowable angle of inclination
and installation location height”, page 22 and see “Maximum allowable angle of
inclination of fitted VISIC100SF”, page 22.