EasyManua.ls Logo

Siemens 8DB10 - Page 89

Siemens 8DB10
214 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06 89/214
Installation
➭ Bolt the panel connection stud ⑧ to the bushing terminal ⑪ using 4 pan-head
bolts M8x50 ⑨ and 4 strain washers ⑩ from the accessories (tightening torque: 20 Nm).
➭ Grease the toroidal sealing ring ③ uniformly with the supplied mounting paste
(e.g. Polylub GLY 801, 0.40 kg).
➭ Insert the toroidal sealing ring ③ in the panel connection housing ⑤ .
Fig. 93: Inserting the toroidal sealing ring
➭ Bolt the panel connection housing ⑤ to the transformer housing ② using 8 pan-head
bolts M6x20 (with Polylok coating) ⑫ from the accessories (tightening torque: 10 Nm).
NOTE
Depending on the panel connection version, the feeder current and whether there are voltage
transformers available, the panel connection stud is delivered in different lengths.
➭ Before assembling the panel connection stud, verify the correct length according to
the supplied overview (861-9582.9).
Fig. 92: Fastening the panel connection stud
⑧
Panel connection stud
⑨
Pan-head bolt M8x50 (4x)
⑩
Strain washer (4x)
⑪
Bushing terminal
Fig. 94: Fastening the panel connection housing
(view from below)
⑤
Panel connection housing
⑧
Panel connection stud
⑫
Pan-head bolt M6x20 with
Polylok coating (8x)

Table of Contents