EasyManua.ls Logo

Slaughter 6330 - Installation and Preparation

Slaughter 6330
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
25
INSTALLATION
Introduction
This section contains information for the unpacking, inspection, preparation for use and
storage of your Slaughter Company, Inc., product.
Unpacking and Inspection
Your instrument was shipped in a custom foam insulated container that complies with
ASTM D4169-92a Assurance Level II Distribution Cycle 13 Performance Test Sequence.
If the shipping carton is damaged, inspect the contents for visible damage such as dents,
scratches, or broken meters. If the instrument is damaged, notify the carrier and the
Slaughter Company customer support department immediately. Please save the shipping
carton and packing material for the carriers inspection. Our customer support
department will assist you in the repair or replacement of your instrument. Please do not
return your product without first notifying us and receiving an RMA (return materials
authorization) number.
Safe Lifting and Carrying Instructions
Proper methods of lifting and carrying can help to protect against injury. Follow the
recommendations below to ensure that instruments are handled in a safe manner.
Determine if the instrument can be lifted by one individual or requires additional
support.
Make sure that your balance is centered and your feet are properly spaced,
shoulder width apart behind the instrument.
Bend at the knees and make sure your back is straight.
Grip the instrument with your fingers and palms and do not lift unless your back
is straight.
Lift up with your legs, not your back.
Keep the instrument close to your body while carrying.
Lower the instrument by bending your knees. Keep you back straight.

Table of Contents

Other manuals for Slaughter 6330

Related product manuals