EasyManua.ls Logo

Slaughter 6330 - Insulation Resistance Test Mode

Slaughter 6330
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
51
2. Insulation Resistance Test Mode
2.1. To initiate a test press the TEST button on the front panel. The red High Voltage
Arrow indicator will flash and the display will immediately show:
IR Set XXX.Xs
XX-XX XXXXV XXXXM
then
IR Delay
XXX.Xs
XX-XX XXXXV
XXXXM
2.2. If the DUT has passed the test, the green TEST button will illuminate and a short
audible beep will be activated. The display will show:
IR Pass XXX.Xs
XX-XX XXXXV
XXXXM
The instrument is ready to perform another test.
2.3. If the operator elects to abort a test in process this can be accomplished by pressing
the RESET button at anytime. The instrument will stop the test process immediately and
the display will show:
IR Abort XXX.Xs
XX-XX XXXXV
XXXXM
Press the TEST button to initiate another test.
2.4. If the insulation resistance exceeds the high limit setting, the red RESET button will
illuminate and an alarm will activate. The display will show:
IR HI-Limit
XXX.Xs
XX-XX XXXXV
XXXXM
To stop the alarm, please press the RESET button once. The alarm will stop and the
display will retain the failure information. The instrument is now ready for the next test.
If the RESET button is pressed again, the failure information on the screen will be
cleared and the display will indicate the setting data of the previous test.

Table of Contents

Other manuals for Slaughter 6330

Related product manuals