Page 86 (Model J)
16.4 24 month / 10,000 hour overhaul procedure
The following instructions, list the order in which the 24 month overhaul should be carried
out.
1. Remove the five fixing screws (A)
indicated from the rear cover.
2. Slide the rear cover towards the rear of
the machine. When the lip has been
disengaged lift the cover off.