EasyManua.ls Logo

SLE SLE5000 Model J - Page 97

SLE SLE5000 Model J
344 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(Model J) Page 97
3. Disconnect the earth strap (G). Retain
the fixing screw. Disconnect the
electrical connector (H).
4. Remove the four nuts and washers (J)
securing the pressure regulator
manifold assembly.
5. Remove the pressure regulator
manifold with the high speed valve
assembly attached.
6. Separate the high speed valve
assembly (K) from the pressure
regulator manifold (L). Place the
pressure regulator manifold to one
side.
7. Discard the high speed valve assembly
(K) as per the WEEE directive.
G
H
J
J
J
J
K
L

Table of Contents

Related product manuals