Innagator | Technical Pack114
What you can do from this page:
Set a real time to start and stop charging or discharging the battery.
Choose to charge the battery from the grid or generator.
Limit export power to the grid.
Set the unit to charge the battery from the grid or generator ticking ‘Grid’ or ‘Gen’ and set what times this
needs to occur.
Set the time to discharge the unit to the load or export to the grid by unticking ‘Grid’ and ‘Gen’.
ZeroExport: The hybrid inverter will not only provide power to the backup load connected but also give
powertothehomeloadconnected.IfPVpowerandbatterypowerareinsucient,itwilltakegridenergy
as a supplement. The hybrid inverter will not sell power to the grid. In this mode, a CT is needed. For the
installationmethodoftheCT,pleaserefertothechapter"CTConnection".TheexternalCTwilldetectpower
owingbacktothegridandwillreducethepoweroftheinverteronlytosupplythelocalload,chargethe
battery, and home load.
GridBackup Load On-Grid Home Load
Battery
Solar
CT