EasyManua.ls Logo

Suzuki GSX-R1000K5 - Page 159

Suzuki GSX-R1000K5
525 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE 3-105
Tighten the valve timing inspection plug 8 to the specified
torque.
Valve timing inspection plug: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
CYLINDER HEAD COVER
Pour engine oil in each oil pocket in the cylinder head.
NOTE:
Be sure to check the valve clearance. (2-7)
Install the dowel pins.
Install the O-rings.
Install the new gaskets to the cylinder head cover.
Apply SUZUKI BOND to the cam end caps of the gaskets as
shown.
99104-31140: SUZUKI BOND “1207B” (USA)
99000-31140: SUZUKI BOND “1207B” (Others)
Place the cylinder head cover on the cylinder head.
Fit a new gasket 1 to each head cover bolt.
Tighten the head cover bolts to the specified torque.
Head cover bolt: Initial: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
Final : 14 N·m (1.4 kgf-m, 10.0 lb-ft)
Use the new gaskets to prevent oil leakage.
Use a new gasket to prevent oil leakage.
SAMPLE

Table of Contents

Related product manuals