EasyManua.ls Logo

Suzuki GSX-R1000K5 - Page 213

Suzuki GSX-R1000K5
525 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FI SYSTEM DIAGNOSIS 4-53
Step 1 (When indicating P0110-H:)
1) Turn the ignition switch OFF.
2) Lift and support the fuel tank. (5-3)
3) Check the IAT sensor coupler for loose or poor contacts.
If OK, then check the IAT sensor lead wire continuity.
4) Disconnect the IAT sensor coupler and ECM coupler.
5) Check the continuity between Dg wire A and terminal Q.
6) Also, check the continuity between B/Br wire B and terminal
S.
IATS lead wire continuity:
Continuity ()
09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
Tester knob indication: Continuity test ()
Is the continuity OK?
7) After repairing the trouble, clear the DTC using SDS tool.
(4-27)
1
YES Go to Step 2.
NO Dg wire or B/Br wire open
1
]
ECM coupler (Harness side)
(Black)
(Gray)
SAMPLE

Table of Contents

Related product manuals