EasyManua.ls Logo

Suzuki GSX-R1000K5 - Page 439

Suzuki GSX-R1000K5
525 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ELECTRICAL SYSTEM 9-27
CKP SENSOR PEAK VOLTAGE
Remove the front seat. (8-7)
NOTE:
Be sure that all couplers are connected properly and the battery
used is in fully-charged condition.
Disconnect the both couplers 1.
Connect the multi-circuit tester with peak volt adaptor as fol-
lows.
Measure the CKP sensor peak voltage between Green/Blue
and Green/White lead wires at the ECM coupler (Black) A.
G/W wire (+ Probe) – G/Bl wire (- Probe)
09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
A Black coupler
Shift the transmission into the neutral and turn ignition switch
“ON”.
Crank the engine a few seconds with the starter motor by
depressing starter button and check the CKP sensor peak
voltage.
Repeat the above test procedure a few times and measure
the highest peak voltage.
Tester knob indication: Voltage ()
CKP sensor peak voltage: 0.5 V and more
(Green/Blue – Green/White)
Before using the multi-circuit tester and peak volt
adaptor, be sure to refer to the appropriate instruction
manual.
G/W
G/Bl
CKP sensor
CKP sensor
coupler
G/W
W
ECM
coupler
Peak
volt
adaptor
G/W
G/Bl
SAMPLE

Table of Contents

Related product manuals