EasyManua.ls Logo

Sym Track Runner 200 - Page 45

Sym Track Runner 200
221 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. LUBRICATION SYSTEM
3-6
Oil Pump Installation
Install the oil pump, and then tighten bolts.
Torque value0.8~1.2kgf-m
Make sure that oil pump shaft can be rotated
freely.
Install oil pump driving chain and sprocket, and
then install snap ring onto oil pump shaft.
Install starting gear and generator.
(Refer to chapter 10)
To this chapter contents

Table of Contents

Related product manuals