29TD410023-B RLF
71 5 3
64 8 2
2
1
3
4
6
7
3
5
ENGINE DISASSEMBLY
REMOVING CYLINDER HEAD
1. Check the tie rod thread protrusion according
to the specification Tie rod thread protrusion.
(See section D Test procedures and
adjustments.)
Remove all nuts in the sequence as illustrated
1
.
2.
14 mm: Remove eight nuts
2
and
washers.
3. Remove four cross bars
3
.
4. Remove the cylinder head.
5. Remove eight sleeves
4
.
6. When replacing a stud
5
, install the new stud
according to the specification M8 stud
cylinder head. (See section D Tightening
torques und assembly instructions.)
Observe in section C Additional working
instructions the chapters Cylinder head
disassembly and Cylinder head reassembly.
7. Remove the cylinder head gasket
7
.
8. Remove two centering pins
6
.
4. Turn the engine 180°.
5. Remove the timing chain
3
.