9
InstallingtheValveManifolds
Partsneededforthisprocedure:
1
Agitation,rate,andmaster-spraymanifold
1
Sectionvalvemanifold
InstallingtheAgitation,Rate,and
Master-SprayValveManifold
1.Alignthe3holesinthebracketoftheagitation,rate,
andmaster-sprayvalvewiththemount(Figure48).
Figure48
1.Bracket
3.Flange-headbolts(5/16x
3/4inch)
2.Mount
2.Assemblethebracketfortheagitation,rate,and
master-sprayvalvestothemount(Figure48)with
the3ange-headbolts(5/16x3/4inch)thatyou
removedinstep1ofRemovingtheAgitation,Rate,
andMaster-SprayValvesfromtheMachine(page15).
3.Torquetheange-headboltsto1878to2542N∙m(175
to225in-lb).
InstallingtheSectionValveManifold
1.Alignthe4holesinthebracketforthesection-valve
withthe4holesinthemount(Figure49).
Figure49
1.Mount
3.Flange-headbolt(5/16x
3/4inch)
2.Bracket
2.Assemblethebracketforthesectionvalvetothe
bracketmount(Figure49)withthe4ange-head
bolts(5/16x3/4inch)thatyouremovedinstep1of
RemovingtheBoom-SectionValves,SupplyHoses,
andSection-ValveMount(page13).
3.Torquetheange-headboltsto1878to2542N∙m(175
to225in-lb).
4.Securethewireharnessofthemachinetothebracket
fortheagitation,rate,andmaster-sprayvalvesand
thebracketforthesectionvalveswiththe5push-in
fasteners(Figure50).