InstallingtheUpperSprayerSupply
Hose—MachineswiththeOptional
EductorKit
1.Alignthestraightbarbedttingoftheuppersupply
hose25x22cm(1x8-5/8inches)andagasket—25x
35mm(1x1-3/8inches)withtheangeoftheadapter
ontheeductor-shutoffvalve(Figure76).
Figure76
1.90°angedelbow—upper
supplyhose25x22cm(1
x8-5/8inches)
4.Filterhead
2.Gasket—25x35mm(1x
1-3/8inches)
5.Straightbarbedtting
3.Flangeclamp—40to
64mm(1-9/16to2-1/2
inches)
6.Adapter(eductor-shutoff
valve)
2.Looselyassemblethehosetotheadapter(Figure76)
withaangeclamp—40to64mm(1-9/16to2-1/2
inches).
3.Alignthe90°angedelbowoftheuppersupplyhose
andthegaskettotheangeofthelterhead(Figure
76).
4.Securethe90°angedelbowtothelterhead(Figure
76)withaangeclamp—40to64mm(1-9/16to
2-1/2inches).
5.Tightentheangeclampthatsecuresstraightbarbed
ttingoftheuppersupplyhosetotheadapterofthe
eductor-shutoffvalve(Figure76).
16
InstallingtheSectionSpray
ValveHoses
Partsneededforthisprocedure:
1
Sectionbypasshose—2.5x146cm(1x57-1/2
inches)
1
Supplyhose—left-boomsection—2x205cm(3/4x
80-13/16inches)
1
Supplyhose—center-boomsection—2x58cm(3/4
x22-13/16inches)
1
Supplyhose—right-boomsection—2x170cm(3/4
x66-13/16inches)
InstallingtheSectionBypassHose
Formachineswithouttheoptionalspraygunkit
ortheoptionalelectrichosereelkit.
Note:Ifyouareinstallingthevalveconversionkiton
amachinewiththeoptionalhandspraywandkitorthe
optionalelectrichosereelkit,skipthisprocure.Youwill
installthesectionbypasshoseinInstallingtheSectionBypass
Hose—MachineswiththeOptionalSprayGunKitorthe
OptionalElectricHoseReelKit(page46).
1.Assemblethe90°quick-connectttingofthesection
bypasshose—2.5x146cm(1x57-1/2inches)onto
thequickcouplingofthebypassmanifoldwiththe
retainer(small)thatissuppliedwiththesectionbypass
hose(Figure77).
37