2.Assembletheagitation-valvebrackettothemountfor
thethrottle-valvebracket(Figure60)with2ange-head
bolts(5/16x3/4inch).
3.Torquetheange-headboltsto1978to2542(175to
225in-lb).
AssemblingtheThrottleValveand
Eductor-ShutoffValveforMachines
withtheOptionalEductorKit
1.Aligntheslotsintheagitation-throttlebracketandthe
slotsintheeductor-shutoffbracketwiththeholesin
themountforthethrottle-valvebracket(Figure61).
Figure61
1.Agitationthrottlebracket)4.Flange-headbolt(5/16x
3/4inch)
2.Bracket(throttlevalve)5.Frontofthemachine
3.Eductor-shutoffbracket
2.Assembletheagitation-valvebracketand
eductor-shutoffbrackettothemountforthe
throttle-valvebracket(Figure61)with2ange-head
bolts(5/16x3/4inch).
3.Torquetheange-headboltsto1978to2542(175to
225in-lb).
13
InstallingtheAgitation-Nozzle
AssemblyandHoses
Partsneededforthisprocedure:
1Agitation-nozzleassembly
Procedure
1.Insertthe3agitationnozzlesoftheagitation-nozzle
assemblyintothebulkheadttingsofthesprayertank
(Figure62).
Figure62
1.Agitationnozzle
(agitation-nozzle
assembly)
3.Agitation-nozzleassembly
2.Retainer
4.Bulkheadtting
2.Securetheagitationnozzleswiththe3retainers(Figure
62)thatyouremovedinstep1ofRemovingthe
AgitationNozzlesfromtheSprayerTank(page13).
3.Assemblethe90°quick-connectttingofthe
agitation-nozzleassemblyontothequickcouplingof
theagitationthrottlevalvewiththeretainerthatis
suppliedwiththeagitation-hoseassembly(Figure63).
30