46
INSTALLATION INSTRUCTION
TEMPERATURE CONTROL REPLACEMENT CONTINUED.......
Figure 8. Temperature Control Leads
Figure 10. Anchoring Relay Shield
___________ STEP 6 ___________
Replace existing temperature control
with new Danfoss control in repair kit:
(See Figure 8).
A. Connect one pink wire from old
control to double terminal #4 on
new temperature control.
B. Place the plastic-coated spade
clip on secondary #4 terminal.
C. Connect other pink wire from old
control to terminal #3 on new
Danfoss temperature control.
(See Figure 8 & 9).
___________ STEP 7 ___________
Anchor the Relay Shield:
(See Figure 10).
A. Secure the new relay by
attaching the relay shield.
B. Relay shield includes two self-
tapping screws. When installing
shield, place shield in position to
cover relay and all exposed wiring.