7
CABINET INSTALLATION AND SET UP CHECKLIST
1) Make sure cabinet is plugged into dedicated outlet. Before plugging in cabinet check to make sure
voltage is adequate for your cabinet. Do not use an extension cord, this will void cabinet
w a r r a n t y.
2) Follow installation instructions for your specific cabinet. Each cabinet is shipped with specific
installation and set up instructions. It is very important to read all information sent with your new
cabinet
3) Make sure shipping blocks (slide doors) and door support brackets (swing doors) are removed.
Doors will not function correctly if this step is not followed.
4) Make sure that your cabinet is leveled correctly. Follow specific instructions with your cabinet and
use castor shims were they are needed. Make sure that legs and castors are installed per instruc-
tions. If directions are not followed this may cause premature unwarranted failure of cabinet legs
or castors. If your cabinet is not level this can cause performance problems that will not be cov-
ered as warranty repairs.
5) When cabinet is set in its final location, make sure the specific clearance guidelines are followed.
These are very important for ventilation in the condensing unit area. If not followed can cause
premature compressor failure.
6) Follow altitude adjustment for temperature control if applicable.
7)
IF YOU HAVE ANY QUESTIONS ABOUT SET UP OR INSTALLATION OF YOUR
NEW CABINET PLEASE CALL OUR TECHNICAL SERVICE DEPARTMENT AT 1-
800-325-6152.
CABINET INSTALLATION AND SET UP CHECKLIST