14
A
A
D E
B C
1
2
3
6.1.4. CHAINSTAY BEARINGS
SPEED SENSOR
REAR BRAKE GUIDE TUBE
DERAILLEUR GUIDE TUBE
# PART NAME
SERVICE PART
NUMBER
QTY SPEC / DESCRIPTION TOOL
TORQUE
Nm in-lbf
A Main pivot bearings — Carbon
Part of suspension bearing
kit. S210600003
2 12 mm id x 24 mm od x 6 mm w, bearing N/A N/A N/A
B Chainstay — Carbon (satin)
S211500005
1 CHS MY22 LEVO SL CRBN, STN CRBN N/A N/A N/A
B Chainstay — Carbon (gloss)
S211500008
1 CHS MY22 LEVO SL CARBON, CARBON, GLS SMK N/A N/A N/A
C Speed sensor cable
S196800019
1 ELE MY20 MTB SL SYSTEM, SPEED SENSOR KIT N/A N/A N/A
D Derailleur cable guide tube 1 TUBE,ICR,5.5 X 7,NYLON,BLK - Cut length: 490 mm N/A N/A N/A
E Rear brake hose guide tube 1 TUBE,ICR,5.5 X 7,NYLON,BLK - Cut length: 410 mm N/A N/A N/A
1. Thread the speed sensor cable from the main pivot end of the chainstay through the lower hole on the non-drive
side until it exits the chainstay behind the horst pivot. When assembling the rear triangle to the front triangle,
thread the speed sensor cable through the motor area and connect the speed sensor into the port on the motor.
2. On each side, press the main pivot bearings (A) into the main pivot bores from the inside of the chainstays.
3. Insert the derailleur guide tube (D) through the ICR port located in the drive side of the chainstay and route it to
the rear port of the chainstay. Insert the brake guide tube (E) through the inner ICR port located in the non-drive
side of the chainstay and route it to the mid port of the chainstay.
Apply green Loctite 603 to all the bearing/bore interface surfaces 12 hours before pressing all the bearings
into their respective pivot locations.