Installation Manual _________________________________________________________________
90 __________________________________________________________________ M210485EN-B
The following numbers refer to Figure 74 on page 89.
1 = Two installation screws for attaching the logger tube to the
radiation shield
2 = Four installation screws for attaching the power supply and
communication unit to the radiation shield
3 = Two attachment brackets
4 = Eight installation bolts for assembling the brackets to the
mast
CAUTION
Be sure that the radiation shield is not installed too high to prevent it
from being damaged when the mast is tilted.
NOTE
To ease the installation of other components under the radiation
shield, install the cover of the radiation shield last, not as shown in
Figure 74 on page 89
NOTE
Always install the radiation shield on the west side of the mast (in
northern hemisphere), that is, to the same side whereto the mast tilts.
Two mounting brackets are pre-assembled on the rear of the radiation
shield. The brackets are intended for mounting the enclosure to the
mast of ∅ 100 mm. To install the radiation shield, follow the
procedure below:
1. Select the suitable installation height. It should be approximately
1.5 to 1.7 m. Eye height is recommended for the best working
access.
2. Mount the brackets (number 3 in Figure 74 on page 89) with the
bolts (4) that have the washers.
Mounting the Logger Tube
The logger tube is mounted under the radiation shield. Refer to Figure
75 on page 91 and Figure 76 on page 91 for mounting details.
1. Attach the mounting piece (number 1 in Figure 75 on page 91)
to the logger tube (2) with one bolt (3).