EasyManuals Logo

Wood-mizer LT70L DH User Manual

Wood-mizer LT70L DH
159 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #59 background imageLoading...
Page #59 background image
Sawmill Operation
Preparing The Sawmill For Towing
Sawmill Operation 60HDdoc102619 4-18
4
CAUTION! Move the hydraulic clamp and turner to provide maximum
ground clearance before towing. Failure to do so may result in damage
to the sawmill.
3. Move the carriage forward to the travel position over the rear bed rail. Position the hole in the saw
head over the travel rest pin.
4. Move the rest pin to its travel position. Secure the rest pin using locking pin.
See Figure 4-3.
5. Lower the saw head until it is it contacts the stop blocks on the mast rails. Secure the saw head with
saw head protection belt.
FIG. 4-3
Rest Pin
Lock Pin

Table of Contents

Other manuals for Wood-mizer LT70L DH

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wood-mizer LT70L DH and is the answer not in the manual?

Wood-mizer LT70L DH Specifications

General IconGeneral
BrandWood-mizer
ModelLT70L DH
CategorySaw
LanguageEnglish

Related product manuals