Sawmill Operation
Preparing The Sawmill For Towing
Sawmill Operation 60HDdoc102619 4-18
4
CAUTION! Move the hydraulic clamp and turner to provide maximum
ground clearance before towing. Failure to do so may result in damage
to the sawmill.
3. Move the carriage forward to the travel position over the rear bed rail. Position the hole in the saw
head over the travel rest pin.
4. Move the rest pin to its travel position. Secure the rest pin using locking pin.
See Figure 4-3.
5. Lower the saw head until it is it contacts the stop blocks on the mast rails. Secure the saw head with
saw head protection belt.
FIG. 4-3