EasyManua.ls Logo

ABB ACS580-01 - Page 108

ABB ACS580-01
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
108 Electrical installation
6. Slide the cable through the hole of the bottom plate and attach the grommet to the
hole.
7. Connect the motor cable:
Ground the shield 360 degrees by tightening the clamp of the power cable
grounding shelf onto the stripped part of the cable (7a).
Connect the twisted shield of the cable to the grounding terminal (7b).
Connect the phase conductors of the cable to the T1/U, T2/V and T3/W
terminals (7c). Tighten the screws to the torque given in the figure.
PE
6
7b
7
7a
7c
Frame size T1/U, T2/V, T3/W PE,
N·m lbf·ft M N·m lbf·ft N·m lbf·ft
R5 5.6 4.1 M5 2.2 1.6 1.2 0.9

Table of Contents

Other manuals for ABB ACS580-01

Related product manuals