EasyManua.ls Logo

ABB IRB 5720 - Page 369

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Torx pan head screw: M5x12 Stainless
steel A2-70
Refit the motor cover with its attachment
screws.
7
Locking liquid: 3HAC041807-004 (Loctite
2400)
Use locking liquid.
Tightening torque: 6 Nm.
xx2100000596
Concluding procedure
NoteAction
Remove the equipment used to unload the upper
arm.
1
Torx pan head screw: M6x16
Stainless steel A2-70
Refit the metal clamp beneath the arm house.2
Tightening torque: 10 Nm.
xx2100002154
See Filling oil into the axis-3 gear-
box on page 163.
Refill the gearbox with oil.3
See Calibration on page 557.Re-calibrate the robot.4
DANGER
Make sure all safety requirements are met when
performing the first test run.
5
Product manual - IRB 5720 369
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8.3 Replacing the axis-3 motor
Continued

Table of Contents

Related product manuals