EasyManua.ls Logo

ABB IRB 5720 - Page 394

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Rotation tool, 3HAB7887-1
xx2100002205
Use caution and lower the motor into posi-
tion on the guide pins, while at the same
time rotating the motor pinion slightly.
Make sure that:
the motor pinion is properly mated
to the gear of the gearbox.
the motor pinion does not get dam-
aged.
the direction of the cable exit is fa-
cing the same way as before remov-
al.
6
Remove the guide pins.7
Tightening torque: 24 Nm.Secure the motor with its attachment
screws and washers.
8
Hex socket head cap screw: (4)
M10x30 12.9 Gleitmo 603+Geomet 500 (IRB
5720-180/2.6, IRB 5720-155/2.6 LID)
M8x25 12.9 Gleitmo 603+Geomet 500 (IRB
5720-125/3.0, IRB 5720-90/3.0 LID)
xx2100002204
See Performing a leak-down test on
page 188.
Perform a leak-down test.9
Disconnect the brake release tool.10
Connecting the axis-5 motor cables
NoteAction
Put the motor cables in place in the open-
ing.
1
Torx pan head screw: M3x12 Stainless
steel A2-70
Refit the cable bracket with the screws.2
Connect the motor cables.3
Connect in accordance with the markings
on the connectors.
Tightening torque: 1 NmSecure the power connector with a screw.4
Continues on next page
394 Product manual - IRB 5720
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8.5 Replacing the axis-5 motor
Continued

Table of Contents

Related product manuals