EasyManua.ls Logo

ABB IRB 5720 - Page 409

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Rotation tool, 3HAB7887-1
xx2000000378
Use caution and lower the motor into posi-
tion on the guide pins, while at the same
time rotating the motor pinion slightly.
Make sure that:
the motor pinion is properly mated
to the gear of the gearbox.
the motor pinion does not get dam-
aged.
5
Remove the guide pins.6
Hex socket head cap screw: (4 pcs)Secure the motor with its attachment
screws.
7
M8x30 12.9 Gleitmo 603+Geomet 500 (IRB
5720-180/2.6, IRB 5720-155/2.6 LID)
M6x25 12.9 Gleitmo 603+Geomet 500 (IRB
5720-125/3.0, IRB 5720-90/3.0 LID)
Tightening torque: 10 Nm
xx2000000377
See Performing a leak-down test on
page 188.
Perform a leak-down test.8
Continues on next page
Product manual - IRB 5720 409
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8.6 Replacing the axis-6 motor
Continued

Table of Contents

Related product manuals