EasyManua.ls Logo

ABB IRB 5720 - Page 438

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx1700001378
Remove the old o-ring to use it as aid in
holding the screws during fitting of the new
gearbox.
A new o-ring is fitted on the new gearbox.
9
Refitting the gearbox
These procedures describe how to refit the axis-1 gearbox.
Preparations before refitting the axis-1 gearbox
NoteAction
CAUTION
The weight of the base is 170 kg
All lifting accessories used must be sized
accordingly.
1
Support legs: 3HAC15535-1.If not already done, fit and secure the four
support legs to the foundation. Then lift up
and secure the base on top of the legs.
2
Tightening torque: 550 Nm
xx2100001135
xx1700000567
Wipe the contact surfaces between gearbox
and base clean from any contamination.
3
Continues on next page
438 Product manual - IRB 5720
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.9.1 Replacing the axis-1 gearbox
Continued

Table of Contents

Related product manuals