EasyManua.ls Logo

ABB OmniCore C90XT - Page 402

ABB OmniCore C90XT
450 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC OK LEDA
SignificanceDescription
Green: All DC outputs are above the specified minimum levels.DC OK LED
Off: One or more DC outputs are below the specified minimum level.
Required test equipment
Equipment needed for troubleshooting.
NoteEquipment
Multimeter
Insulating gloves
3HAC065464-009Circuit diagram - OmniCore C90XT
Preparations
Action
Check the FlexPendant for errors and warnings.1
Power the controller off. Wait one minute, power the controller on.2
Make sure that the control system power supply is in run-time mode.3
Wait 30-60 seconds after power-on.
Continues on next page
402 Product manual - OmniCore C90XT
3HAC073706-001 Revision: D
© Copyright 2020-2021 ABB. All rights reserved.
7 Troubleshooting
7.3.10 Troubleshooting the power supply
Continued

Table of Contents

Related product manuals