Note/IllustrationAction
xx1900000482
In the Conveyor Workarea window, enter
"LinearWA1" in the Workarea Name text
box.
8
In the Conveyor Board drop down list,
select the correct conveyor board which
has been connected to the liner conveyor.
Tip
The connection between the conveyor
board and the conveyor are defined by
users.
9
In the Conveyor drop down list, select
the "Linear1" conveyor.
10
In the Workarea Type radio box, select
the "Place" option.
11
Click OK to finish the adding of the linear
1 conveyor work area.
12
xx1800001417
On the ribbon-tab, click Workarea under
Layout.
13
xx1900000483
In the Conveyor Workarea window, enter
"LinearWA2" in the Workarea Name text
box.
14
In the Conveyor Board drop down list,
select the correct conveyor board which
has been connected to the second liner
conveyor.
Tip
The connection between the conveyor
board and the conveyor are defined by
users.
15
In the Conveyor drop down list, select
the "Linear2" conveyor.
16
In the Workarea Type radio box, select
the "Place" option.
17
Click OK to finish the adding of the linear
2 conveyor work area.
18
Continues on next page
340 Application manual - PickMaster® Twin - PowerPac
3HAC064218-001 Revision: B
© Copyright 2021 ABB. All rights reserved.
5 Production examples
5.3 Example: Mixing one pick work area and two place work areas
Continued