Agilent 1290 Infinity Binary Pump User Manual 163
Maintenance
9
Preparing the Pump Module for Transport
Preparing the Pump Module for Transport
1 Remove solvent inlets from solvent reservoirs. Disconnect the solvent
tubing from the inlet of primary pump heads for both solvent channels. Use
a syringe for removing liquid from the solvent tubings between solvent
reservoir, shutoff valve panel, solvent selection valve, degassing unit and
pump inlets. Switch the solvent selection valve if applicable.
When If the module shall be transported or shipped.
Parts required # p/n Description
1 9301-0411 Syringe; Plastic
1 9301-1337 Syringe adapter
1 G4220-44000 Protective Foam
Preparations Flush both solvent channels with isopropanol.
Mechanical damage
➔ For shipping the module, insert the Protective Foam to protected the module from
mechanical damage.
➔ Be careful not to damage tubing or capillary connections while inserting the module
in the Protective Foam.