EasyManua.ls Logo

Berthold LB 134 - 3. Commissioning; 3.1 Connecting the Device

Berthold LB 134
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LB 134 2. System Description
15
Figure 2.2: Position of internal dose rate probe
Connections The connections for the power supply unit (PSU), the head-
phones (jack plug), relay connection for the external signal
lamp and RS485 communication are located on the left side of
the device. USB host and device connections and the Fischer
connector for the external probes are located on the right side.
Headphones PSU Relays and RS485
Figure 2.3a: Left side of LB 134 with connections

Table of Contents

Related product manuals