b) You may also proceed in reverse order: First, put the front
side of the probe against the pivots and then push the rear
side down against the tapered bar.
Figure 7.22: Inserting the Tritium probe
Figure 7.22: Closing the gas valve when inserting the probe
7.9.6 Commissioning of Tritium Probe
Sdfsf
1. Remove the transport packaging and check the equip-
ment parts for completeness and integrity.
Installing the P10 gas cylinder and double pressure reduc-
er
2. Place the P10 gas cylinder (closed!) in the holding de-
vice on the trolley and secure it with both straps.
3. Screw the closed double pressure reducer onto the
gas cylinder by placing the sleeve nut onto the screw