Chapter 2 BK730-2 Base Page 2-26
2.5 Maintenance Schedule
The maintenance schedule table below applies to equipment operated daily on an 8-hour
basis. If the equipment is to be used more frequently, the maintenance schedule must be
adjusted accordingly.
Table 2-6: Maintenance Schedule Table
Period Maintenance Function
Daily
Wipe table surface clean of paper, dust and other accumulated debris.
Remove the front door and clean any debris that may have fallen into
the machine.
Remove any tabs that may have settled on the rollers, belts and form
plates in the tab-wrap section. Use of Varsol will facilitate removal of
any adhesive glue that has cured.
Examine the table belts and rollers for wear. Replace if necessary.
Monthly
Grease gears accessible through the Outfeed Roller Cover (P/N
700537). See Appendix A, drawing BKT730-2. Special gear grease
oil such as Shell Capac Lube is recommended.
Semi Annually
Remove the tabletop and examine all mechanical drive components
including belts, shafts, bearings, and rollers for wear. Replace if
necessary.
Note: Acquiring a small air compressor is recommended as compressed air is useful in
removing debris.
Buskro Ltd. BK730-2 Tabber