EasyManua.ls Logo

Circutor CVM-E3-MINI - 6�9�- Maximum Demand Integration Period

Circutor CVM-E3-MINI
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Press the key for 3 seconds to enter the edit mode. The prog icon will flash on the left of the
screen.
The key is used to browse the different options.
Configuration values
Table 28: Configuration values: Measurement system.
Measurement system
Possible values
4-3Ph
Three-phase network measurement with a 4-wire connection.
3-3Ph
Three-phase network measurement with a 3-wire connection
3-ArOn
Three-phase network measurement with a 3-wire connection and
transformers with an ARON connection.
(4)
3-2Ph
Two-phase network measurement with a 3-wire connection.
2-2Ph
Single-phase network measurement, phase to phase, with a 2-wire
connection.
2-1Ph
Single-phase network measurement, phase to neutral, with a
2-wire connection.
(4)
Option not available for the models: CVM-E3-MINI-FLEX and CVM-E3-MINI-FLEX-WiEth.
To validate the value, press the key for 3 seconds; the prog icon will stop flashing.
Press key to access the next programming step.
6.9.- MAXIMUM DEMAND INTEGRATION PERIOD
The maximum demand integration period is programmed in minutes on this screen.
Press the key for 3 seconds to enter the edit mode. The prog icon will flash on the left of the
screen.
Press the key to modify the value of the flashing digit.
When the desired value is shown on the screen, use the and keys to move the edit cursor.
To validate the value, press the key for 3 seconds; the prog icon will stop flashing.
If the value entered by the user is out of the range of programming values, the programmed value will
be deleted and the system will restore it to the last saved value.
61
Instruction Manual
CVM-E3-MINI

Table of Contents

Related product manuals