Index
IN-10
Catalyst 2950 Desktop Switch Hardware Installation Guide
78-11157-05
SFP modules
1000BASE-LX
2-15
1000BASE-SX 2-15
1000BASE-ZX 2-15
actuator button latch, removing 3-31
bale-clasp latch, removing 3-31
cabling recommendations 2-16
connecting to 3-49 to 3-50
described 2-14 to 2-15
installation 3-28 to 3-30
Mylar tab latch
illustrated
3-29
removing 3-31
removing 3-30 to 3-32
SFP ports, illustrated 2-7
shelf-mounting 3-22
SNMP network management platforms 2-32
software switch management 2-32
specifications A-1 to A-9
speed LED 2-22, 2-23, 2-24
stacking the chassis warning 3-3, D-22
status LED 2-22, 2-24
straight-through cable
connecting to
10/100/1000 ports
3-34
10/100 ports 3-34
1000BASE-T GBIC module ports 3-47
straight-through cable (continued)
connectivity problems
4-4
pinout
four twisted-pair, 10/100 ports
B-9
four twisted-pair, 1000BASE-T ports B-10
two twisted-pair B-8
SunNet Manager 2-32
system LED 2-20
T
table-mounting 3-22
technical assistance xxviii to xxix
technical specifications A-1 toA-9
Telnet, and accessing the CLI 2-32
temperature
operating
A-2 to A-6
warning 3-3, D-12
terminal-emulation software 1-4
translated warnings D-1 to D-45
troubleshooting
diagnosing problems
4-2 to 4-5
understanding POST results 4-2