4.1 Site preparation
I
n
troduction
This section describes the site planning and preparation that should be performed
before the product is installed.
In this section
Section See page
4.1.1 Delivery, storage and unpacking 43
4.1.2 Room requirements 45
4.1.3 Site environmental requirements 47
4.1.4 Power requirements 48
4 Installation
4.
1 Site preparation
NanoAssemblr Ignite and Ignite+ Operating Instructions NIN1134 AA 42