EasyManuals Logo

Datalogic Magellan 83 Product Reference Guide

Datalogic Magellan 83
558 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #71 background imageLoading...
Page #71 background image
System Power-Up Recap
Product Reference Guide 2-39
System Power-Up Recap
The System Power-Up procedure may vary depending upon the require-
ments of your POS system. It is generally a good practice to power-down
(switch off) all equipment prior to connecting cables. Check with your
System Supervisor and/or refer to your POS terminal manual for proper
power-down and power-up procedures and interface requirements when
connecting any peripheral device.
If you have not identified any specific requirements for your POS system,
follow these steps.
1. Power-down the POS terminal.
2. Ensure that power is disconnected from the scanner.
3. Connect the scanner and scale interface cables to your POS termi-
nal. This connection may use one or two cables depending upon
your POS terminal interface.
4. [EAS units ONLY] Connect the EAS interface cable.
5. Connect the Remote Display cable if your model is a scanner/scale
and make any connections to optional equipment, such as a hand-
held scanner.
NOTE
SENSORMATIC EAS SYSTEMS:
Always Apply power to the EAS Controller box before powering on the scan-
ner.

Table of Contents

Other manuals for Datalogic Magellan 83

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Datalogic Magellan 83 and is the answer not in the manual?

Datalogic Magellan 83 Specifications

General IconGeneral
BrandDatalogic
ModelMagellan 83
CategoryBarcode Reader
LanguageEnglish

Related product manuals