DA 62 AFM
Normal Operating
Procedures
i) Nacelle underside . . . . . . . . . . . . . . . . . . . . . check for excessive contamination
particularly by oil, fuel, and other
fluids
j) Auxiliary tank drain (if installed) . . . . . . . . . . . drain off to check for water and
sediment (drain until no water
comes out)/visual inspection
k) Auxiliary tank filler (if installed) . . . . . . . . . . . visual inspection, tank filler closed
3. Left wing:
a) Entire wing surface . . . . . . . . . . . . . . . . . . . . visual inspection
b) Tank air outlet on lower surface . . . . . . . . . . visual inspection
c) Tank drain/tank air inlet . . . . . . . . . . . . . . . . . drain off to check for water and
sediment (drain until no water
comes out)/visual inspection
d) Openings on lower surface . . . . . . . . . . . . . . check for foreign objects and for
traces of fuel (if tank is full, fuel may
spill over through the tank vent)
e) Stall warn device . . . . . . . . . . . . . . . . . . . . . . visual inspection
f) Tank filler. . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection, check closed
g) Pitot probe . . . . . . . . . . . . . . . . . . . . . . . . . . . clean, orifices clear, cover
removed, no deformation
h) Vortex generators . . . . . . . . . . . . . . . . . . . . . undamaged, 10 pieces, clean
i) Wing tip . . . . . . . . . . . . . . . . . . . . . . . . . . . . . visual inspection
j) Static dischargers . . . . . . . . . . . . . . . . . . . . . visual inspection
k) Position light, strobe light (ACL) . . . . . . . . . . visual inspection
CONTINUED
Doc. No. 11.01.05-E Rev. 0 11-Jan-2019 Page 4A - 13