INSTALLATION
Local code may require the installation of re suppression for your oven. The EDGE re suppression piping
provides a clean, intentional application of the plumbing required to deliver chemical re suppression to your
EDGE oven stack. These systems are available in single, double and triple stack arrangement.
Final connections are to be made by your Fire Suppression contractor.
FIRE SUPPRESSION
One (1) loosely assembled, control side, re suppression pipework kit (3/8” NPT, stainless steel)
One (1) loosely assembled, non-control side, re suppression pipework kit (3/8” NPT, stainless steel)
One (1) connecting pipe (model specic: 30”, 40”, 60” & 70”)
One (1) or 2 (Two) EDGE Heat Shield for Fire Suppression Systems (P/N: 145209-FS)
FIRE SUPPRESSION KIT CONTENTS
KIT CONTENTS
UNION
A
3
A
4
A
1
A
2
CONNECTION PIPE
B
3
B
4
B
2
B
1
#2 Phillips Screwdriver
3/8” Wrench/Socket
7/16” Wrench/Socket
Medium to Large Adjustable Wrench
TOOLS REQUIRED
Fire Suppression Nozzles two (2) per Oven Deck
Flexible Agent Distribution Hose (such as ANSUL 435982)
1/2” - 3/8” NPT Reducer
OTHER ITEMS YOU WILL NEED