24
Installation
Air/Flue gas system
Installation Instructions - twin pipe -
Installation
)LWWLQJWKHÀXHV\VWHPWRWKHDSSOLDQ-
ce must be carried out by a compe-
tent person in accordance with these
installation instructions
General
t Store material inside.
t Check the components on possi-
ble damages.
t ,QVWDOODIWHUQDWLRQDOUHJXODWLRQ
Fill out chimney label (when supplied)
and place it near boiler adaptor.
t Pipes must be installed free of
tension.
t 3D\DWWHQWLRQWRWKHÀXHGLUHFWLRQ
The sockets must be pointing to
the terminal.
$VVHPEO\ÀXHJDVV\VWHP
Starting to assemble the pipes from
the boiler.
Assemble the pipes by turning and
pushing them till the bottom of the
joint.
127('RQ¶WXVHVRDSRLOOXEULFDQW
Use only water as lubricant.
Before pipe exensions:
When using bends, the maximum
SHUPLVVLEOHOHQJWKRIÀXHJDVV\VWHP
can be deducted from the table on
pag.21.
Important
,QVWDOORQO\LQVLGHEXLOGLQJVRQXQÀD-
mable wall
Cleaning
Outside can be cleaned with a wet
towel or with some detergent.
,QVWDOOWHQVLRQIUHH
Ø < 100 mm
Cutting the pipe
t Take out the inner tube by turning
it until it releases from its security
position
t Cut the pipe
t Take off the burrs from the cutting
edge to prevent cutting the seals
t Re assembles the pipes
Ø 130 mm
Max 1 Meter
Max 1 Meter
Max 2 Meters
8-15 mm