38
Commissioning
Commissioning Protocol
THISON-L
Commissioning Protocol
Project
Boiler type Project
Serial number Adress
Year City
Nominal load (Hi) [kW] Date
Nominal output (Hi) [kW] Engineer
System
Water pressure [bar] Installation: Roof top
Water pH [-] Ground floor
Water hardness [°dH] Basement
Water chloride [mg/l] Other:.......................
Water ǻT full load [°C] Hydraulics: Low velocity header
Water ǻp boiler [kPa] Plated heat exchanger
Water flow [m
3
/h] Bypass boiler
Pump setting [-] Other:........................
Safety devices
High limit settings [°C] Water flow sensor checked
Temp. limiter setting [°C] Fluegas sensor checked
100% load 50% load Min load
Gas consumption [m
3
][m
3
][m
3
]
Gas pressure [mbar] [mbar] [mbar]
CO
2
[%] [%] [%]
O
2
[%] [%] [%]
CO [ppm] [ppm] [ppm]
NOx [ppm] [ppm] [ppm]
T
atmosferic
[°C] [°C] [°C]
T
fluegas
[°C] [°C] [°C]
T
water, flow
[°C] [°C] [°C]
T
water, return
[°C] [°C] [°C]
Ionisation current [μA] [μA] [μA]
P
fan
[mbar] [mbar] [mbar]
P
top panel
[mbar] [mbar] [mbar]
P
combustion chamber
[mbar] [mbar] [mbar]
REMARKS