Commissioning
Gas supply
Condensate connection
Flue and air intake connections
Gas supply
Check the gas supply connection
WR WKH ERLOHU IRU WLJKWQHVV ,I DQ\
leakage is found, reseal the le-
DNDJH EHIRUH VWDUWLQJ WKH ERLOHU
Remove any air between the gas
valve and the gas line. This can
be done at the test point (1) at the
gas pressure switch. Don’t forget
WR FORVH WKH WHVW SRLQW DIWHUZDUGV
Check the gas type and values
with the local gas company, in or-
der to know for which gas type the
boiler should be commissioned.
Condensate connection
Remove the syphon (2) from the
condensate connection. Fill it with
water and place it back in the origi-
nal position. Make sure the syphon
LV ¿OOHG EHIRUH VWDUWLQJ WKH ERLOHU LQ
RUGHUWRSUHYHQWÀXHJDVHVGLVFKDUJLQJ
WKURXJK WKH FRQGHQVDWH FRQQHFWLRQ
Flue and air intake connections
&KHFNZKHWKHUWKHÀXHDQGDLULQWD-
ke systems are made according to
the national and local regulations.
,QVWDOODWLRQVZKLFKGRQ¶WFRPSO\ZLWK
the regulations, are not allowed to be
commissioned.
Make sure that all connections are
IUHH7KHVL]HRIÀXHJDVDQGDLULQWD-
ke connections may not be reduced.
2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the elco THISION L and is the answer not in the manual?

elco THISION L Specifications

General IconGeneral
Brandelco
ModelTHISION L
CategoryBoiler
LanguageEnglish

Related product manuals