Mounting the Switch
Enterasys D-Series Hardware Installation Guide 2-17
Figure 2-14 Installing Power Supplies into the Lockbox Tray
a. Threadthestrapthroughthemountingtrayandaroundthepowersupplyinthe
followingorder:
(1) Throughthebridgeanchorononesideofthepowersupply
(2) Underthepowersupply
(3) Throughthebridgeanchorontheothersideofthepowersupply
b. Wraptheendsofthestrapoverthetop
ofthepowersupplyandfastensecurely.
c. Repeatstep 1onpage 2‐16withanotherhook&loopstraptosecuretheotherendofthe
powersupplytothemountingtray.Finalplacementofpowersuppliesisshownin
Figure 2‐14onpage 2‐17.
2. PlugtheDCpowercordfromthepower
supplyintotheswitchDCpowerreceptaclethatis
appropriateforyourtype ofpowersupply.
•FortheD2‐PWRsupply,plugintothePWR1‐AorPWR2‐Areceptacle.
•FortheD2‐PWR‐POEsupply,plugintothePWR1‐BorPWR2‐Breceptacle.
3. PlugtheACcordintothepower
supply’sACreceptacle.
4. (Optional)Ifyouhavepurchasedasecondpowersupplyandwishtoinstallit,repeatstep 1
onpage 2‐16thoughStep 3usingthesecondpowersupplyslotinthetrayandtheunused
PWRreceptacleappropriateforthesupply.Referto“ConnectingPowertotheSwitch”on
page 2‐26formoreinformationaboutpowerredundancy.
5. PlugeachACpowercordintoadedicated,groundedACoutlet.See“ConnectingPowerto
theSwitch”onpage 2‐26forinformationaboutthe initializationprocess.