EasyManua.ls Logo

Enterasys D2G124-12 - Connecting Power to the Switch

Enterasys D2G124-12
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting Power to the Switch
2-26 Installation
2. Connectthefour‐prongendoftheconnectingcordtotheD2‐HIPWR‐POE’sPowerOutput
receptacle.
3. Repeatsteps1and2ifyouareconnectingasecondD2‐HIPWR‐POEforredundancy.
4. Connectthethree‐prongendoftheconnectingcordtothePWR1‐Bpowerinputreceptacleof
theD2G124
‐12P.IfconnectingasecondD2‐HIPWR‐POEforredundancy,connectittothe
PWR2‐Bpowerinput.
5. ProceedtoconnectpowertotheswitchasdescribedinConnectingPowertotheSwitch.
Connecting Power to the Switch
Youcanconnecttoasingleprimarysourceofpowerortotwosourcesofpowerforredundancy,as
describedinthefollowingsections.Theexampleusedheredescribesconnectingtwopower
sources.
ThefollowingredundantpowersuppliesareavailabletobepurchasedfromEnterasysfor
connectiontotheD2switch.
Followtheappropriateinstructionsinthissectiontoinstallyour
component(s):
•D2‐PWR,aDCpowersupplycapableofprovidingpowertoafully‐loadednon‐PoEswitch.
•D2‐PWR‐POE,aDCpowersupplyrecommendedforPoEpowerredundancy
ToconnectpowertotheD2switch:
1. Ifyouhavenotalready
donesoaspartofoneoftheswitchmountingprocedures,plugtheDC
endofthepowercordfromeachpowersupplyintoeachoftheswitchDCpowerreceptacles
thatareappropriateforyourtypeofpowersupplies.
•FortheD2‐PWRsupply,plugintothePWR1‐Aand
PWR2‐Areceptacles
•FortheD2‐PWR‐POEsupply,plugintothePWR1‐BandPWR2‐Breceptacles
•FortheD2‐HIPWR‐POEpowercombiner,attachcablingasinstructedin“Connectinga
D2‐HIPWR‐POEPowerCombiner”onpage 2‐25.
2. PlugtheACcordintothepowersupply’sACreceptacle.Repeat
foreachpowersupply.
3. PlugeachACpowercordintoadedicated,groundedACoutlet.
4. VerifythattheappropriatepowerLEDs(PWR1andPWR2)turnonasdescribedinTable 2‐1
onpage 2‐27andtheCPU(system)LEDturnsreduntiltheD2completesitsinitialization.
TheseLEDsarevisiblefrom
thebackoftheswitchasshowninFigure 1‐1onpage 1‐2,aswell
asfromthetopandfrontoftheswitchasshowninFigure 1‐2onpage 1‐2.
Iftheinitializationprocessissuccessful,theCPULEDturnsgreen.IftheCPULEDdoesnotturn
green,
refertoChapter 3fortroubleshootinginformation.
Notes: Both power supplies must be of the same type to support redundancy.
The D2-PWR supply will power either the D2G124-12 or the D2G124-12P without PoE support. The
D2-PWR-POE is the only supply for powering the D2G124-12P with PoE support
Note: To take advantage of redundancy capabilities, each power cord must be plugged into a
separate, dedicated AC outlet.
Note: It is normal for the surface of the device to be warm.

Table of Contents

Enterasys D2G124-12 - Connecting Power to the Switch